Plant as-built capture, Mesaieed gas processing facility

Subsea pipeline landfall mapping and shallow gas hazard detection across industrial port waters, verifying pipe burial depths prior to intake dredging.

Sector: Oil & gas downstream Duration: 10 days on-site Location: Mesaieed, Qatar
Plant as-built capture, Mesaieed gas processing facility
SYSTEM SUPPLIED Innomar SES-2000 Sub-bottom Profiler
PROJECT SCOPE & OVERVIEW

About This Campaign

Subsea pipeline landfall mapping and shallow gas hazard detection across industrial port waters, verifying pipe burial depths prior to intake dredging.

Subsea pipeline landfall mapping and shallow gas hazard detection across industrial port waters, verifying pipe burial depths prior to intake dredging.

TECHNICAL EXECUTION

Challenge & Delivered Outcome

THE CHALLENGE

Operational & Site Constraints

Dense network of live unshielded power cables crossing survey corridor required high penetration with zero magnetic interference.

THE OUTCOME

Deliverables & Client Impact

Clear stratigraphy to 8m sediment depth, accurately isolating pipeline position without operational disruption.

Key Technologies:
Pipeline inspection Sub-bottom profiling Stratigraphy